Following the testing of routine operation, the goal is to identify operators' difficulties in detecting and identifying hazards, and in conducting recovery procedures
Following the functional testing, the goal is to tune the alarm thresholds
Beside the need to identify bugs and design mistakes that we missed during functional testing, we need to identify resilience problems not detected in the regular resilience testing mentioned earlier
Updated on 08 Apr 2016.