Guidelines for proactive testing:
The subjects of the test are according to the
resilience requirements .
The
architecture is key to the
resilience assurance, therefore, its
operation should be validated prior to the testing.
The
admin station should be developed prior to the testing
The
admin station should be integral part of the
system enabling on-site testing, and facilitating maintenance and training activities.
Following the functional testing, the goal is to identify missed
hazards due to
mistakes in rule implementation
Following the functional testing, the goal is to set proper
resilience parameters
Following the
testing of
routine operation, the goal is to identify
operators' difficulties in detecting and identifying
hazards, and in conducting recovery procedures
Following the functional testing, the goal is to tune the
alarm thresholds
Beside the need to identify bugs and design
mistakes that we missed during functional
testing, we need to identify resilience problems not detected in the regular resilience
testing mentioned above